Back
|

Tenants Resources

Estimated Fitting Out Costs

Economy Mid-Range Premium
General Construction Per sq ft Per sq ft Per sq ft
Preliminaries / Insurance $30 $35 $40
Carpets / Floor finishes $25 $35 $45
Wall Finishes $20 $33 $65
Ceiling Finishes $25 $36 $48
Partitions (glass/gypsumboard) / doors $48 $53 $58
Window Blinds $12 $18 $24
Total $160 $210 $280
System Furniture / Fixtures and Fittings Per sq ft Per sq ft Per sq ft
Custom and system furniture $110 $180 $255
F & F including filing and storage cabinets
Conference table and presentation cabinet $40 $50 $65
Total $150 $230 $320
M & E Services Per sq ft Per sq ft Per sq ft
Electrical Works & Networking $60 $70 $90
Fire Protection System $18 $20 $25
Air-conditioning Works $42 $60 $75
Total $120 $150 $190
Miscellaneous Per sq ft Per sq ft Per sq ft
Signage $17 $22 $27
Plumbing Works (wet pantry) $16 $16 $16
Security $17 $22 $27
Total $50 $60 $70
GRAND TOTAL $480 $650 $860
Reinstatement Costs

Tenants should note that reinstatement costs (to strip out everything a tenant puts in), depends upon the quality of the building and building management requirements, as well as the extent of works the tenant undertook at the beginning.

These costs range from $80 to $300 per sq ft (dependent on how much M & E work is involved).